10.18 More tiling and the septic is installed.

Here are some additional pictures of the tile in the upstairs bathroom and the finished septic system. We are having the septic inspection tomorrow and then they start building the retaining walls and filling the back yard with lots and lots of dirt. The tile in the upstairs bathroom is along the walls that surround the pedestal tub. We should have tile on the floor tomorrow as well as the shower in this bathroom. Sarah picked out a very cool subway style design and a row of mosaic just below the row of trim. We will use the same style of tile in the shower, only sqaure instead of rectangular. Click here to check out the gallery.